FrameGate Sourcing, an Independent Buyer Desk

FrameGate Sourcing helps business buyers collect factory quotations for prefabricated residential houses. The desk is not a manufacturer, does not publish a plant capacity, and does not borrow another company history. If you arrived from a leisure homes search, treat that reference as context for the alternative product you are researching. This page explains the role of the desk, not a brand story.

Review RFQ Checklist
  1. Use
  2. Dimensions
  3. Loads
  4. Jurisdiction
  5. Quantity
  6. Destination
Quiet sourcing desk with house drawings and a blank comparison sheet

How a brief moves, without a company timeline

  1. Reference noted

    The searched name is written down as context. It is not treated as an order for that brand, and it is not used as proof that a factory can match a proprietary detail.

  2. Requirements normalized

    Use, module dimensions, layout, finish scope and the authority having jurisdiction are copied into one sheet. Unknown wind speed or ground snow load stays unknown.

  3. Suppliers asked the same questions

    Factories receive the packet and are asked to name assumptions. FrameGate Sourcing does not rank them by a private score and does not claim a prior audit of their shops.

  4. Replies returned for your decision

    You see included, excluded and open items. Contracting, engineering stamps and site safety remain outside this desk.

Boundaries that stay visible

No original-brand supply

Alternative products are compared. The original brand product is not offered from this site.

No invented credentials

Standards such as ASCE 7 are items to request on the quoted system. They are not credentials held by FrameGate Sourcing.

No shared price story

There is no published discount against a market price. You compare quotations that share specification, quantity, destination and scope.

No site design

Foundation interface, crane lift plan and local permits are identified as responsibilities. They are not designed here.

No mixed code labels

HUD Code manufactured housing, IRC houses, IBC modular projects and recreational vehicles are not treated as the same approval path.

No leftover claims

Factory age, output, warranty length and customer counts from other websites are left with those publishers.

Start from the requirement, not from a logo

Send the occupancy, the footprint and the destination you can already defend. The desk will ask factories for alternative quotations and will flag scope gaps before you read the totals.

Send Project Requirements